SuperStation
Last updated
Last updated
The following sections will have all necessary information for the assembly of the SuperStation.
Install the Main Rails onto the Driver Station Base using a total of ten #10-32 x 3/8"L bolts and secure them using #10-32 nuts.
Attach the Laptop Plate to the Main Rails in your desired location using four #10-32 x 3/8"L bolts and nuts.
Install the Side Rails and Corner Gussets using #10-32 x 3/8"L bolts in the locations shown below.
Ensure that the bottom bolts go through both the Base plate and the Side Rail.
Install the Port Covers in the appropriate locations using four #10-32 x 3/8"L bolts and #10-32 nuts.
This step can be skipped if the Port Covers are not being used.
Install the handles using the included 1/4"-20 x 1"L bolts.
The included Tube Nuts need to be pressed into the Handles before the installation process.