LogoLogo
FRC Build System
  • Overview and Features
    • General Specs
  • General Info
    • Kit Contents
      • Complete Kit
      • Individual Components
    • Customization
  • Assembly Instructions
    • Getting Started
    • Single Upper Kit
      • Steps 1-4
      • Steps 5-8
    • Battery Rack Kit
      • Steps 1-5
      • Steps 6-9
    • Corner Case Kit
    • Table Kit
      • Steps 1-4
      • Steps 5-9
    • Toolbox Kit
    • SuperCart
      • Steps 1-4
      • Steps 5-8
      • Steps 9-12
      • Steps 13-16
    • SuperStation
  • Misc
    • FAQ & Trouble Shooting
    • Changelog
Powered by GitBook
On this page
  • Step 1
  • Step 2
  • Step 3
  • Step 4
  • Step 5
Export as PDF
  1. Assembly Instructions

SuperStation

PreviousSteps 13-16NextFAQ & Trouble Shooting

Last updated 9 months ago

The following sections will have all necessary information for the assembly of the SuperStation.

Step 1

Install the Main Rails onto the Driver Station Base using a total of ten #10-32 x 3/8"L bolts and secure them using #10-32 nuts.

Step 2

Attach the Laptop Plate to the Main Rails in your desired location using four #10-32 x 3/8"L bolts and nuts.

Step 3

Install the Side Rails and Corner Gussets using #10-32 x 3/8"L bolts in the locations shown below.

Ensure that the bottom bolts go through both the Base plate and the Side Rail.

Step 4

Install the Port Covers in the appropriate locations using four #10-32 x 3/8"L bolts and #10-32 nuts.

This step can be skipped if the Port Covers are not being used.

Step 5

Install the handles using the included 1/4"-20 x 1"L bolts.

The included Tube Nuts need to be pressed into the Handles before the installation process.