LogoLogo
FRC Build System
  • Overview and Features
    • General Specs
  • General Info
    • Kit Contents
      • Complete Kit
      • Individual Components
    • Customization
  • Assembly Instructions
    • Getting Started
    • Single Upper Kit
      • Steps 1-4
      • Steps 5-8
    • Battery Rack Kit
      • Steps 1-5
      • Steps 6-9
    • Corner Case Kit
    • Table Kit
      • Steps 1-4
      • Steps 5-9
    • Toolbox Kit
    • SuperCart
      • Steps 1-4
      • Steps 5-8
      • Steps 9-12
      • Steps 13-16
    • SuperStation
  • Misc
    • FAQ & Trouble Shooting
    • Changelog
Powered by GitBook
On this page
  • Step 5
  • Step 6
  • Step 7
  • Step 8
Export as PDF
  1. Assembly Instructions
  2. SuperCart

Steps 5-8

PreviousSteps 1-4NextSteps 9-12

Last updated 9 months ago

Step 5

Install #10-32 x 3/8"L bolts into the top of the Left and Right Rails securing into the front rail. Secure them with #10-32 nuts.

Step 6

Install the Back Rail using four #10-32 x 3/8"L bolts, secure loosely with #10-32 nuts.

These bolts will be tightened in the next step.

Step 7

Install the Left and Right Handle rails using six #10-32 x 3/8"L bolts and secure them with #10-32 nuts.

Step 8

Install the Left and Right Gusset using eight #10-32 x 3/8"L bolts and secure them with #10-32 nuts.

The bolts installed during should now be fully secured.

Step 6