LogoLogo
FRC Build System
  • Overview and Features
    • General Specs
  • General Info
    • Kit Contents
      • Complete Kit
      • Individual Components
    • Customization
  • Assembly Instructions
    • Getting Started
    • Single Upper Kit
      • Steps 1-4
      • Steps 5-8
    • Battery Rack Kit
      • Steps 1-5
      • Steps 6-9
    • Corner Case Kit
    • Table Kit
      • Steps 1-4
      • Steps 5-9
    • Toolbox Kit
    • SuperCart
      • Steps 1-4
      • Steps 5-8
      • Steps 9-12
      • Steps 13-16
    • SuperStation
  • Misc
    • FAQ & Trouble Shooting
    • Changelog
Powered by GitBook
On this page
  • Step 5
  • Step 6
  • Step 7
  • Step 8
Export as PDF
  1. Assembly Instructions
  2. Single Upper Kit

Steps 5-8

PreviousSteps 1-4NextBattery Rack Kit

Last updated 10 months ago

Step 5

Take the shims along with the assembly from Step 4 and lay them in the case. Line up the shims with the assembly, make sure everything is square and straight. Use tape if needed to hold the shims into position while marking out hole positions. Take a sharpie and mark all the holes to drill to 0.201" into the wood.

Do not drill out the holes in this step.

The reference picture below only shows half of the drilling locations that need to be marked.

Ensure that all rails that are in contact with the case get the holes marked.

Step 6

Remove the shims and assembly from the case and drill holes. If any of the holes line up with any metal or handles we recommend not drilling those holes.

Step 7

Take shims and assembly from Step 4 and set them back in the case in the same layout that was used to mark the drilling locations in Step 5. Use #10-32 x 1.000" L bolts with lock nuts to bolt everything down. We recommend not tightening everything fully yet.

Step 8

Install the rest of the bin rails and then tighten everything down.