Step 1
The installation of the Snap-in Nuts into the Horizontal Rails will be demonstrated below.
Insert the Snap-in Nuts into the corresponding slots.
Step 2
The installation of the Snap-in Nuts into the Vertical Rails will be demonstrated below.
Insert the Snap-in Nuts into the corresponding slots.
Step 3
Take the Vertical Rail Tubes from Step 2 and install them onto the Horizontal Rail Tubes using #10-32 x 1/2" L bolts into the snap nuts.
The spacing of the vertical rails is based on the bin sizes used.
Step 4
Take the bin rails and install them onto the vertical rails using #10-32 x 1/2" L bolts into the snap nuts.