LogoLogo
FRC Build System
  • Overview and Features
    • General Specs
  • General Info
    • Kit Contents
      • Complete Kit
      • Individual Components
    • Customization
  • Assembly Instructions
    • Getting Started
    • Single Upper Kit
      • Steps 1-4
      • Steps 5-8
    • Battery Rack Kit
      • Steps 1-5
      • Steps 6-9
    • Corner Case Kit
    • Table Kit
      • Steps 1-4
      • Steps 5-9
    • Toolbox Kit
    • SuperCart
      • Steps 1-4
      • Steps 5-8
      • Steps 9-12
      • Steps 13-16
    • SuperStation
  • Misc
    • FAQ & Trouble Shooting
    • Changelog
Powered by GitBook
On this page
  • Step 9
  • Step 10
  • Step 11
  • Step 12
Export as PDF
  1. Assembly Instructions
  2. SuperCart

Steps 9-12

PreviousSteps 5-8NextSteps 13-16

Last updated 10 months ago

Step 9

Mount the Caster onto the Caster support using the bolts and nuts included.

Repeat this for the remaining Casters.

Step 10

Install the Caster Supports to the Cart Pan using ten #10-32 x 3/8"L bolts per support. Fully secure them with #10-32 nuts.

Step 11

Install the Battery Holder to the Cart Pan using six #10-32 x 3/8"L bolts. Secure them with #10-32 nuts.

Step 12

Install the Driver Station Holders using two #10-32 x 3/8"L bolts and secure them with #10-32 nuts.