LogoLogo
FRC Build System
  • Overview and Features
    • General Specs
  • General Info
    • Kit Contents
      • Complete Kit
      • Individual Components
    • Customization
  • Assembly Instructions
    • Getting Started
    • Single Upper Kit
      • Steps 1-4
      • Steps 5-8
    • Battery Rack Kit
      • Steps 1-5
      • Steps 6-9
    • Corner Case Kit
    • Table Kit
      • Steps 1-4
      • Steps 5-9
    • Toolbox Kit
    • SuperCart
      • Steps 1-4
      • Steps 5-8
      • Steps 9-12
      • Steps 13-16
    • SuperStation
  • Misc
    • FAQ & Trouble Shooting
    • Changelog
Powered by GitBook
On this page
  • Step 1
  • Step 2
  • Step 3
  • Step 4
Export as PDF
  1. Assembly Instructions
  2. SuperCart

Steps 1-4

PreviousSuperCartNextSteps 5-8

Last updated 10 months ago

Step 1

Install three of the Vertical Rails onto the cart pan. Use #10-32 x 3/8"L bolts and secure them with #10-32 nuts on the pan's interior

Step 2

Install the two Corner Support Rails onto the cart pan. Use #10-32 x 3/8"L bolts and secure them with #10-32 nuts on the pan's interior.

Step 3

Install the Front Rail onto the assembly from Step 2. Use four #10-32 x 3/8"L bolts and secure them with #10-32 nuts on the pan's interior.

Do not fully tighten the bolts in this step.

Step 4

The left and right rails will have to slide directly next to the front rail.

Install the Left and Right Rails with four #10-32 x 3/8"L bolts on each rail and secure them with #10-32 nuts.

The Front Rail bolts from Step 3 should be tightened during this step. All bolts should now be secured.