Step 1
The installation of the Snap-in Nuts into the Horizontal Rails will be demonstrated below.
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Bottom Battery Horizontal Rail
Step 2
The installation of the Snap-in Nuts into the Vertical Rails will be demonstrated below.
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Battery Vertical Rail (Right)
Step 3
Take the Bottom Battery Horizontal Rail and the Battery Horizontal Rail (Middle) from Step 1, along with two of the Battery Vertical Rail (Middle) from Step 2 and bolt them together using #10-32 x .500" L bolts into the snap nuts.
Repeat this step for the other half of the Battery Rack.
Step 4
Take the assembly from Step 3 along with the Battery Vertical Rail (Right) and Battery Vertical Rail (Left) and bolt them together using #10-32 x .500" L bolts into the snap nuts.
Repeat this step for the other half of the Battery Rack.
Step 5
Take the assembly from Step 4 along with the Top Battery Horizontal Rail and bolt them together using c bolts into the snap nuts.
Repeat this step for the other half of the Battery Rack.