Step 12-14
Last updated
Last updated
Vibra-TITE VC-3 Threadmate () is recommended on all bolts that thread into a tapped hole.
Insert the 45T Bevel Gear by either tapping it in with a dead blow hammer or using an arbor press.
Be sure to align the bolt holes in the Aluminum Swerve Wheel with the tapped holes in the 45T Bevel Gear.
The Wheel Drive Axle is symmetric. The orientation it is assembled in does not matter.
When installing the Wheel Assembly, be sure the 45T Bevel Gear and 15T Bevel Gear are on the same side.
After running gearbox for 15-30 minutes, reapply a light amount of grease. Reapply as needed.
Apply grease to all gears after final assembly to ensure smooth operation and reduce wear during use. Once greased, rotate and spin the wheel to distribute the grease evenly before powering up.