LogoLogo
FRC Build System
  • Overview and Features
    • General Specs
  • General Info
    • Kit Contents
      • Complete Kits
      • Individual Components
    • Gearbox Selection
      • Ratio Options
    • Configurations
  • Assembly Instructions
    • Getting Started
    • Material Cutting
    • Bearing Blocks
    • Cascade Pulley Blocks
    • Single Stage
      • Elevator Mast
      • Carriage
      • General Assembly
      • Chain
    • Multi-Stage
      • Elevator Mast
      • Carriage
      • 2nd Stage
      • Extra Stage
      • General Assembly
      • String & Chain
  • Applications
    • Mounting
  • Misc
    • Maintenance
    • FAQ & Trouble Shooting
    • Changelog
Powered by GitBook
On this page
  • Step 1
  • Step 2
  • Step 3
  • Step 4
Export as PDF
  1. Assembly Instructions
  2. Multi-Stage

General Assembly

PreviousExtra StageNextString & Chain

Last updated 10 months ago

Step 1

Slide the carriage assembly into the 1st stage assembly from the front. It may help with installation to lift the carriage up from the bottom and angle it forward a bit. Slide the carriage down and return it to a vertical position.

Once in, the front/back bearings in the carriage and the 1st stage should both be on the same side.

Step 2

Bolt the 3/4" OD Radial Bearings into the Bearing Blocks on the backside of the carriage as indicated in green.

At this point, the elevator carriage should be able to move smoothly up/down, and a small amount of wiggle left/right and front/back is to be expected. This ensures the elevator will not bind.

Step 3

Slide the assembly from Step 2 into the Elevator Mast Assembly from the front. It may help with installation to lift the assembly up from the bottom and angle it forward a bit. Slide that assembly down while returning it to a vertical position.

If you are assembling an Elevator with 3 or more stages, The assembly from Step 2 will be installed in the Extra Stages before being installed in the Elevator Mast Assembly.

Step 4

Bolt the 3/4" OD Radial Bearings into the Bearing Blocks on the backside of the carriage as indicated in green.

At this point, the 1st stage should be able to move smoothly up/down, and a small amount of wiggle left/right and front/back is to be expected. This ensures the elevator will not bind.