Carriage

Carriage With Ratchet Plate

Step 1

Assemble the Carriage Horizontal Tube with aluminum tube plugs and appropriate plastic tube plug sleeves. The tube plugs can be installed using #10-32 x 3/8"L bolts.

Repeat this step for both Carriage Horizontal Tubes.

Step 2

Bolt the Carriage Vertical Tubes to the assembled Carriage Horizontal Tubes using the #10-32 x 1 1/2"L bolts When assembled, the #10-32 x 1 1/2"L bolts will sit inside the Elevator Clamping Block.

Make sure to install the Bearing Blocks with only one of the 3/4" OD Radial Bearings. This will allow for an easy installation process.

The two bottom clamping blocks must sit higher up to provide clearance for an extra ratchet plate.

Step 3

The bushings should be a slip or a light press fit into the vertical carriage tube. Install the bearings into the plates before installing the plates onto the carriage.

Use four #10-32 x 3"L bolts to attach the 1/2" Hex Ratchet Plates onto the carriage assembly.

If you are not using the ratchet plate and are tensioning the string with the #35 Chain Turnbuckle, This step can be skipped.

Last updated