Assembly

For the purpose of this manual, all tubes were cut to dimensions used in the CAD model. However, the tubes can be cut to any length desired. See the Material Cutting section for more information.

All holes used in this guide must be drilled clearance for #10-32 before assembly.

Depending on the number of stages that you are building, not all of the following Assembly Instructions are required. Listed below are the required sections for building a 1 Stage, 2 Stage, or 3+ Stage GreyT Elevator (Cascade).

1 Stage

2 Stage

3+ Stages

Last updated