Steps 5-8
Last updated
Last updated
Install all tubes as shown in the locations shown below. Use four #10-32 x 3/8”L bolts to secure each end of tube in place. Rivnuts need to be facing up on each tube.
Install all tubes as shown in the locations shown below. Use four #10-32 x 3/8”L bolts to secure each end of tube in place. Rivnuts need to be facing up on each tube.
Place the MDF Short Shelf and MDF Long Shelf on top of the aluminum structure from the previous step. The counter bores in the MDF Shelf will line up with the rivnuts in the tubing. Install all #10-32 x 1.25”L bolts.
DO NOT over tighten the bolts.
Install all tubes as shown in the locations shown below. Use four #10-32 x 3/8”L bolts to secure each end of tube in place. Install as many sets of dividers as desired.