LogoLogo
FRC Build System
  • Overview and Features
  • General Info
    • Individual Components
  • Assembly Instructions
    • Getting Started
    • OMIO CNC Router Stand (Mobile Cart)
      • Steps 1-4
      • Steps 5-8
      • Steps 9-13
      • Leveling The Router Stand
    • Installing OMIO X8 CNC Router
    • OMIO CNC Router Enclosure (Base)
      • Steps 1-4
      • Steps 5-8
      • Steps 9-12
    • Installing Router Enclosure
  • Misc
    • FAQ & Trouble Shooting
    • Changelog
Powered by GitBook
On this page
  • Assembly Prep
  • Key Assembly Instructions
Export as PDF
  1. Assembly Instructions

Getting Started

PreviousIndividual ComponentsNextOMIO CNC Router Stand (Mobile Cart)

Last updated 2 days ago

Assembly Prep

Refer back to the page and ensure that all necessary parts are located before starting assembly steps.

Tools Required For Assembly

These tools are required for the assembly of the OMIO CNC Router Stand (Mobile Cart) and the OMIO CNC Router Enclosure (Base)

  • Dead Blow Hammer

  • SAE/Inch Allen Set

Vibra-TITE VC-3 Threadmate () is recommended on all bolts that thread into a tapped hole.

Key Assembly Instructions

The following pages cover the basic assembly instructions for the OMIO Cart and Enclosure.

Individual Components
Vibra-TITE
Cover

Mobile Cart Assembly

Assembly Instructions

Cover

Installing Omio X8 CNC Router

Installation Of The Router To Cart

Cover

Leveling

Cart Leveling Instructions

Cover

Router Enclosure (Base)

Enclosure Assembly Instructions

Cover

Final Assembly

Attaching the Router Enclosure to the Mobile Cart