The installation of the Snap-in Nuts into the Horizontal Rails will be demonstrated below.
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Bottom Battery Horizontal Rail
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Middle Battery Horizontal Rail
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Top Battery Horizontal Rail
The installation of the Snap-in Nuts into the Vertical Rails will be demonstrated below.
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Battery Vertical Rail (Right)
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the other three Battery Vertical Rails (Middle)
The reference picture above shows the installation of half of the Snap-in Nuts that are needed. The picture below shows the finished product.
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Battery Vertical Rail (Left)
Take the Bottom Battery Horizontal Rail and the Battery Horizontal Rail (Middle) from Step 1, along with two of the Battery Vertical Rail (Middle) from Step 2 and bolt them together using #10-32 x .500" L bolts into the snap nuts.
Repeat this step for the other half of the Battery Rack.
Take the assembly from Step 3 along with the Battery Vertical Rail (Right) and Battery Vertical Rail (Left) and bolt them together using #10-32 x .500" L bolts into the snap nuts.
Repeat this step for the other half of the Battery Rack.
Take the assembly from Step 4 along with the Top Battery Horizontal Rail and bolt them together using c bolts into the snap nuts.
Repeat this step for the other half of the Battery Rack.