The installation of the Snap-in Nuts into the Horizontal Rails will be demonstrated below.
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Bottom Battery Horizontal Rail
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Middle Battery Horizontal Rail
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Top Battery Horizontal Rail
The installation of the Snap-in Nuts into the Vertical Rails will be demonstrated below.
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Battery Vertical Rail (Right)
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the other three Battery Vertical Rails (Middle)
The reference picture above shows the installation of half of the Snap-in Nuts that are needed. The picture below shows the finished product.
Insert the Snap-in Nuts into the corresponding slots.
Repeat this step for the second Battery Vertical Rail (Left)
Take the Bottom Battery Horizontal Rail and the Battery Horizontal Rail (Middle) from Step 1, along with two of the Battery Vertical Rail (Middle) from Step 2 and bolt them together using #10-32 x .500" L bolts into the snap nuts.
Repeat this step for the other half of the Battery Rack.
Take the assembly from Step 3 along with the Battery Vertical Rail (Right) and Battery Vertical Rail (Left) and bolt them together using #10-32 x .500" L bolts into the snap nuts.
Repeat this step for the other half of the Battery Rack.
Take the assembly from Step 4 along with the Top Battery Horizontal Rail and bolt them together using c bolts into the snap nuts.
Repeat this step for the other half of the Battery Rack.
The following pages will have all necessary information for the assembly of the SuperPit Battery Rack Kit.
The battery connectors are not included in this kit.
The Battery connectors are not included in the kit.
Take the charger holders and battery holders and install SB50 or SB120 connectors using #10-32 x .750" L bolts into the pem nuts. Use washer shims as needed to make the surface that the battery slides on smooth and flush.
Repeat this step for all of the charger holders and battery holders.
If using the SB50 connector you will need to drill out the holes in the connector so a #10-32 bolt can fit through.
Install the battery holder from Step 6 onto the assemblies completed in Step 5 using #10-32 x .750" L Counter Sink bolts.
Leave the bottom two rows empty for the moment. We recommend not tightening everything fully yet.
Install assembly in case where desired using the #10-32 x .500"L Particleboard Screws.
Make sure to add the #10-32 x .500"L Particleboard Screws onto the top portion of the Battery Rack and into the table top.
Install the remaining charger holders and battery holders and then tighten everything down.