LogoLogo
FRC Build System
  • Overview and Features
  • General Info
    • Kit Contents
  • Assembly Instructions
    • Reef Pipe
    • Cage
Powered by GitBook
On this page
  • Step 1
  • Drilling Guide
  • Drilling Orientation
Export as PDF
  1. Assembly Instructions

Reef Pipe

PreviousKit ContentsNextCage

Last updated 4 months ago

The following steps outline the assembly of the Reef Pipe using U-Bolts. Teams can also weld the pipes together for added strength and durability.

Step 1

Insert the U-Bolt into the Short Reef Pipe and place at the correct height. Tighten nuts on U-bolt until the Short Reef Pipe can no longer twist left/right or slide up/down.

The backing plate of the U-bolt will be deformed when the nuts are fully tightened.

Drilling Guide

Slide the Drilling Guide found below onto the assembled Reef Pipe and drill out two holes marked below.

Drilling Orientation

Before drilling out the two marked holes, ensure that the orientations of the Reef Pipe and Drilling Jig are as shown in the image below.

44MB
Reef Drill Guide.STEP