Standalone Tower
Rivets are not included with the Net Structure.
3/16" rivets with a .125" - .250" Grip Length (WCP-0449) are required for the assembly steps below.
Step 1
Mount the Tower Base Angles onto the Base Bottom using 3/16" Rivets as shown below.
The Rivets should be installed from the bottom of the Base to allow the Tower to lay as level as possible to the ground.
The Small Tower Base in this step can be replaced with the Tower Base Plate (WCP-2200), if purchased.
Step 2
Slide the Outer Inner Uprights together and secure using 3/16" Rivets as shown below.
Repeat this step for the second set of Tower Uprights.
Step 3
Mount the Uprights from Step 2 onto the Base Plate from Step 1 using the provided 1/4"-20 x 2-1/2"L bolts and 1/4"-20 nuts as shown below.
Step 4
Slide the Tower Rungs into the Uprights from Step 3 and secure using the provided 1/4"-20 x 3-1/2"L bolts and 1/4"-20 nuts as shown below.
Repeat this step to mount all of the Tower Rungs.
Last updated