Full Tower

circle-exclamation

Step 1

Mount the Tower Base Angles onto the Base Bottom using 3/16" Rivets as shown below.

circle-info

The Rivets should be installed from the bottom of the Base to allow the Tower to lay as level as possible to the ground.

circle-check

Step 2

Slide the Outer Inner Uprights together and secure using 3/16" Rivets as shown below.

circle-info

Repeat this step for the second set of Tower Uprights.

Step 3

Mount the Uprights from Step 2 onto the Base Plate from Step 1 using the provided 1/4"-20 x 2-1/2"L bolts and 1/4"-20 nuts as shown below.

Step 4

Slide the Tower Rungs into the Uprights from Step 3 and secure using the provided 1/4"-20 x 3-1/2"L bolts and 1/4"-20 nuts as shown below.

circle-check

Step 5

Install a 2" x 2" Tube Plug into each end of the Outpost Frame Vertical Tubes then secure them with #10-32 x 3/8"L bolts as shown below.

Step 6

Mount the Outpost Frame Top Tube to the tubes from Step 5 using the #10-32 x 2"L bolts as shown below.

Step 7

Mount the Tower Support Tube to the assembly from Step 6 using the Tower Support Gusset. Secure this using the 1/4"-20 x 3-1/2"L bolts and 1/4"-20 nuts as shown below.

circle-exclamation

Step 8

Slide the Tower Brace to the assembly from Step 7 using the 1/4"-20 x 2-1/2"L bolts and 1/4"-20 nuts as shown below.

Step 9

Mount the Tower Upright Gusset to the Tower Support Tubes from Step 8 using the 1/4"-20 x 2-1/2"L bolts and 1/4"-20 nuts as shown below.

Step 10

Combine the assemblies from Step 4 & Step 9 using the 1/4"-20 x 1"L bolts.