# Top Block

Assembly instructions are interchangeable between all sizes of the GreyT Top Block. For the purposes of this User Guide, the 2” GreyT Top Block is used as an example.

{% hint style="success" %}
Vibra-TITE VC-3 Threadmate ([Vibra-TITE](https://wcproducts.com/products/threadlocker)) is recommended on all bolts that thread into a tapped hole.
{% endhint %}

## Step 1

The 1/4” ID x 5/8” OD bearings will sit in the slots in the Top Block. A ziptie can be used to hold the 1/4” Dowel Pin in place to make assembly of the Top Block easier.&#x20;

The table below shows the Dowel Pin size used for each Top Block

{% hint style="info" %}
This step must be repeated for both halves of the GreyT Top Block you are assembling.
{% endhint %}

| **Top Block Tube Size** | **Corresponding Dowel Pin Length** |
| ----------------------- | ---------------------------------- |
| 1-1/2"                  | 1-1/4"                             |
| 2"                      | 1-3/4"                             |
| 2-1/2"                  | 2-1/4"                             |
| 3"                      | 2-3/4"                             |

![](/files/s9FJKwPQwliej6FOKeGP)

## Step 2

Slide on all components in the order shown in the image below.&#x20;

The table below shows the #10-32 bolt length, #10-32 spacer length, and CF Spring width for each size Top Block.

{% hint style="info" %}
This step will be repeated for both halves of the GreyT Top Block you are assembling.
{% endhint %}

<table data-header-hidden><thead><tr><th width="213.73489783171232"></th><th width="150"></th><th width="150"></th><th></th></tr></thead><tbody><tr><td><strong>Top Block Tube Size</strong></td><td><strong>Bolt Length</strong></td><td><strong>Spacer Length</strong></td><td><strong>CF Spring Width</strong></td></tr><tr><td>1-1/2"</td><td>2"</td><td>1-1/2"</td><td>1/2"</td></tr><tr><td>2"</td><td>2-1/2"</td><td>2"</td><td>3/4"</td></tr><tr><td>2-1/2"</td><td>3"</td><td>2-1/2"</td><td>1"</td></tr><tr><td>3"</td><td>3-1/2"</td><td>3"</td><td>1"</td></tr></tbody></table>

![](/files/hc06keAqMjaiZYuW64v5)

## Step 3

The assembled halves from Step 2 should bolt together. Make sure the #10-32 Spacers are fully seated in the Top Block pockets before tightening the bolts.

{% hint style="warning" %}
The Top Block must be assembled with the CF Springs in the correct orientation shown in Step 2, and in the image down below.
{% endhint %}

![](/files/yOBfg84ItXjm7akdjPZU)


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://docs.wcproducts.com/welcome/greyt/greyt-telescope/assembly-instructions/top-block.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
