Step 1-5

circle-check

Step 1

These bearings will be a light press fit and may be pressed in by hand or with an arbor press. The image below shows the side the bearings must be installed from for all configurations of the Base Telescope Gearbox.

Step 2

The 1/2” ID x 1-1/8” OD Flanged Bearing will be a light press fit and may be pressed in by hand or with an arbor press. The image below shows the side the bearing must be installed from for all configurations of the Base Telescope Gearbox.

The Nutstrips used to mount the GreyT Telescope must be cut to 1-1/2” long and assembled in the orientation shown in the image below.

circle-info

The Nutstrips are an optional way of mounting the GreyT Telescope. If you plan on mounting the Telescope differently, you may omit the Nutstrips and associated Bolts from this step.

Step 3

The 1/2” Rounded Hex ID x 1-1/8” OD Flanged Bearing will be a light press fit and may be pressed in by hand or with an arbor press. The image below shows the side the bearing must be installed from for all configurations of the Base Telescope Gearbox.

The Nutstrips used to mount the GreyT Telescope must be cut to 1-1/2” long and assembled in the orientation shown in the image below.

circle-info

Just like in the previous step, the Nutstrips in this step are completely optional. If you plan on using a different mounting method, you may omit the Nutstrips and associated bolts from this step.

Step 4

The Kraken X60 Motor is installed using two #10-32 x 1/2”L bolts.

Step 5

Slide on all components in the order shown in the image below. If you plan on using a CTRE Mag Encoder on the Output Shaft, you must drill out the shaft and press in the 1/4” OD x 1/2” L Magnet.

circle-exclamation
file-download
26KB
file-download
26KB

Last updated