Structure
Step 1
Install a 2" x 1" Tube Plug into each end of the of the Vertical Structure Tubes using two #10-32 x 3/8"L bolts as shown below. Additional bolts will be added in later assembly steps.
Step 2
Install a 1" x 1" Tube Plug into each end of the Horizontal Rails using #10-32 x 3/8"L bolt as shown below. Additional bolts will be added in later assembly steps.
Step 3
Install and fully capture a 1/2" Rounded He using a Bearing Retention Plate and Roller Center Plates as shown below. Secure the plates using #10-32 bolts.
Step 4
Mount the Horizontal Rails from Step 2 onto the Vertical Rail from Step 3 using #10-32 bolts as shown below.
Step 5
Install T Gussets onto the assembly from Step 4 using #10-32 x 3/8"L Bolts and 3/16" Rivets.
Step 6
Install the 1.5" x 1.5" Support Tube to the assembly from Step 5 using the Gussets and hardware shown below.
Step 7
Install the Plastic Hopper Guard onto the Assembly from Step 6 using #10-32 x 1-1/2"L Bolt and Nuts.
Step 8
Install two 90 Degree Mounting Brackets to the Vertical Structure Tubes from Step 7 using #10-32 x 3/8"L Bolts.
Step 9
Install the Hooks onto the 1" x 1" Hook Tube using the appropriate #10-32 Bolts and Nuts as shown below.
Step 10
Install the Hook assembly from Step 9 to the Structure assembly from Step 8.
Step 11
Step 12
Press a 5/8" ID Tube Connecting Nut into each end of the 3/4" OD Standoffs.
Installing the Tube Connecting Nuts can be done using an Arbor press or a dead blow hammer.
Last updated

