LogoLogo
FRC Build System
  • Overview and Features
    • General Specs
  • General Info
    • Individual Components
    • Ratio Options
      • Custom Gear Ratios
  • Maintenance
  • Assembly Instructions
    • Getting Started
      • Step 1-4
      • Step 5-8
  • Misc
    • FAQ & Trouble Shooting
    • Changelog
Powered by GitBook
On this page
Export as PDF
  1. Assembly Instructions

Getting Started

PreviousMaintenanceNextStep 1-4

Last updated 11 days ago

Assembly Prep

Refer back to the page and ensure that all necessary parts are located before starting assembly steps.

Tools Required For Assembly

These tools are required for the assembly of the WCP SS Flipped Gearbox (Single Speed, 2 Stages)

  • Snap Ring Pliers (For 1/2" snaprings)

  • Allen Keys

    • 1/8"

The gearbox should be assembled before installation, unless there is a space issue during installation that would prevent this.

Vibra-TITE VC-3 Threadmate () is recommended on all bolts that thread into a tapped hole.

Apply grease to all gears after final assembly to ensure smooth operation and reduce wear during use.

Individual Components
Vibra-TITE
Lucas Red "N" Tacky