Getting Started
Last updated
Last updated
Refer back to the Individual Components page and ensure that all necessary parts are located before starting assembly steps.
These tools are required for the assembly of the WCP Single Stage Gearbox.
Snap Ring Pliers (For 1/2" snap rings)
Allen Keys
1/8"
The gearbox should be assembled before installation, unless there is a space issue during installation that would prevent this.
Blue Loctite (McMaster P/N 1004A12) is recommended on all bolts that thread into a tapped hole.