LogoLogo
FRC Build System
  • Overview and Features
  • General Info
    • Individual Components
    • Configurations
  • Assembly Instructions
    • Getting Started
    • Tube Plug Assembly
  • Applications
    • Mounting
      • Corner Connections
      • Middle of Tube
  • Misc
    • Changelog
Powered by GitBook
On this page
Export as PDF
  1. Applications
  2. Mounting

Corner Connections

PreviousMountingNextMiddle of Tube

Last updated 11 months ago

This is a common connection that teams can utilize the WCP Tube Plugs and Sleeves in. This connection can be seen in a variety of instances in the structures that many teams built. Gussets can now be omitted to keep the outside of a frame flat or to keep other areas free.

When passing a bolt through a tube, it is recommended to make a clearance hole in one side for the head of the bolt rather than passing a longer bolt through the tube.

Any combination of tube sizes can be used in this example.