LogoLogo
FRC Build System
  • Overview and Features
  • General Info
    • Individual Components
    • Accessories
      • Accessory Highlight
  • Assembly Instructions
    • Getting Started
    • OMIO Router Assembly
      • Steps 1-4
      • Steps 5-8
      • Steps 9-12
      • Steps 13-16
      • Steps 17-21
    • Setting Up Mach3
    • Initial Power and Testing
      • Steps 1-4
      • Steps 5-9
  • Basic Operation
    • Basic Operation
      • Wireless Remote
      • Setting A Zero
    • Running a Program
    • Screen Sets
  • Misc
    • Recommendations
    • FAQ & Trouble Shooting
    • Changelog
Powered by GitBook
On this page
Export as PDF
  1. Assembly Instructions

Initial Power and Testing

PreviousSetting Up Mach3NextSteps 1-4

Last updated 11 months ago

This will be a general test for the machine to ensure that everything is connected correctly. Please ensure that the computer, control box, and OMIO are all connected.