LogoLogo
FRC Build System
  • Overview and Features
    • Stage Tube Lengths
    • Tubing Hole Pattern
  • General Info
    • Kit Contents
      • Complete Kits
      • Individual Components
      • Ratio Kits
    • Ratio Options
      • Custom Gear Ratios
    • Configurations
  • Assembly Instructions
    • Getting Started
    • Bottom Block
    • Top Block
    • Base Gearbox
      • Step 1-5
      • Step 6-10
    • Base Gearbox with Brake
      • Step 1-5
      • Step 6-11
    • Base Gearbox with Ratchet
      • Step 1-5
      • Step 6-11
    • Base Gearbox (Flipped)
      • Step 1-5
      • Step 6-11
    • Final Assembly
  • Applications
    • Mounting
      • External String
      • Internal String
    • Hooks
    • Combined Gearbox
  • Misc
    • Maintenance
    • FAQ & Trouble Shooting
    • Changelog
Powered by GitBook
On this page
  • Step 1
  • Step 2
Export as PDF
  1. Assembly Instructions

Bottom Block

PreviousGetting StartedNextTop Block

Last updated 10 months ago

Assembly instructions are interchangeable between the 1”, 1-1/2”, 2”, and 2-1/2” GreyT Telescope Bottom Blocks.

Blue Loctite () is recommended on all bolts that thread into a tapped hole.

Step 1

The size of the 1/4” ID bearings used in this step are determined by the wall thickness of tube you are using. For 1/8” wall tube these bearings will be 1/4” ID x 1/2” OD bearings, and for 1/16” wall tube these bearings will be 1/4” ID x 5/8” OD bearings.

Step 2

There should be one Bearing Stack-Up for each slot in the GreyT Bottom Block you are assembling; 4 for the 1” Tube Bottom Block, and 8 for the 1-1/2” to 2-1/2” Tube Bottom Blocks.

McMaster P/N 1004A12